Skip to content

Record Phase 538 eraser feasibility boundary#200

Open
ExplodingUFO wants to merge 4 commits into
masterfrom
feature/phase-538-eraser-feasibility
Open

Record Phase 538 eraser feasibility boundary#200
ExplodingUFO wants to merge 4 commits into
masterfrom
feature/phase-538-eraser-feasibility

Conversation

@ExplodingUFO
Copy link
Copy Markdown
Owner

@ExplodingUFO ExplodingUFO commented May 12, 2026

Summary

  • Record Phase 538 as the eraser behavior/API feasibility gate for GitHub Phase 538: eraser behavior/API feasibility gate #199 / bead avalonia-node-map-a3w.
  • Clarify that current selection.delete / Delete Selection / selection-delete evidence is graph-selection deletion, not an eraser cursor, collision trail, or eraser-specific hit-testing route.
  • Update EN/ZH parity docs and focused roadmap docs tests while preserving Phase 539-540 as future tracker-backed work.

Closes #199

Merge Order Note

Test Plan

  • dotnet test tests\AsterGraph.Demo.Tests\AsterGraph.Demo.Tests.csproj -c Release --filter "FullyQualifiedName~ParityRoadmapDocs_RecordPhase538EraserBehaviorApiFeasibilityGateInBothLocales" --verbosity minimal
  • dotnet test tests\AsterGraph.Demo.Tests\AsterGraph.Demo.Tests.csproj -c Release --verbosity minimal
  • dotnet build AsterGraph.sln -c Release --verbosity minimal
  • git diff --check

@ExplodingUFO ExplodingUFO force-pushed the feature/phase-538-eraser-feasibility branch from c0d1d59 to d05ab2a Compare May 13, 2026 01:18
@ExplodingUFO
Copy link
Copy Markdown
Owner Author

Readiness note for external review (2026-05-13):

  • Reviewed the Phase 538 docs/test diff: docs/en/phase-0-reactflow-parity-audit.md, docs/zh-CN/phase-0-reactflow-parity-audit.md, and tests/AsterGraph.Demo.Tests/ReactFlowParityRoadmapDocsTests.cs.
  • Fresh local verification in .worktrees/phase-538-eraser-feasibility passed:
    • dotnet test tests\AsterGraph.Demo.Tests\AsterGraph.Demo.Tests.csproj -c Release --filter "FullyQualifiedName~ParityRoadmapDocs_RecordPhase538EraserBehaviorApiFeasibilityGateInBothLocales" --verbosity minimal
    • dotnet test tests\AsterGraph.Demo.Tests\AsterGraph.Demo.Tests.csproj -c Release --verbosity minimal (281 passed)
    • dotnet build AsterGraph.sln -c Release -v:minimal
    • git diff --check
  • GitHub checks are green and the branch is mergeable; the remaining blocker is the required external review (reviewDecision=REVIEW_REQUIRED).

No admin-bypass requested; leaving this PR pending required review.

# Conflicts:
#	.beads/issues.jsonl
@ExplodingUFO
Copy link
Copy Markdown
Owner Author

Current blocker update (2026-05-13, after stale-master repair):

  • PR Record Phase 538 eraser feasibility boundary #200 is still the lowest open PR in the whiteboard stack.
  • Current head: 636f2622a97af73de4b59ae3165dd5cebdb77f09.
  • The previous stale-master conflict was resolved by merging master into feature/phase-538-eraser-feasibility; the branch now reports mergeable=MERGEABLE.
  • All GitHub checks on the current head are successful, including hygiene-proof, framework matrix (net8.0, net9.0, net10.0), linux-validation, macos-validation, contract-proof, and both release-validation jobs.
  • Local verification after the merge repair also passed:
    • focused Phase 538 roadmap-doc test: 1/1
    • full AsterGraph.Demo.Tests: 281/281
    • git diff --check: clean

Remaining blocker is only repository review policy: reviewDecision=REVIEW_REQUIRED, mergeStateStatus=BLOCKED. I cannot approve my own PR. Do not merge downstream PRs (#202 and later) until this PR receives an eligible review/approval or an explicit admin-bypass decision.

@ExplodingUFO
Copy link
Copy Markdown
Owner Author

PR #200 stack refresh (2026-05-14):

Next action needed: an eligible GitHub review/approval for #200, or explicit admin-bypass authorization. I am not merging downstream PRs or bypassing this gate without that decision.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Phase 538: eraser behavior/API feasibility gate

1 participant